UVA University Hall
Design build services, hazardous material abatement and demolition of 4 athletic venue structures and connecting abridgement infrastructure along with site demolition and subsequent preparation to follow the long-term redevelopment plans of the university. Due to safety concerns to nearby infrastructure, implosion of the largest structure (University Hall basketball arena) was selected as the preferred method of removal.
Ready to partner with RenascentDC? Contact us!